Your drywall should end on stud or be butted up in the center with another piece of drywall.
2 drywall sheets meeting on same joist.
Or you can attach cleats to the two joists as you suggest.
If water based textures are being applied to the ceiling then 1 2 interior ceiling board or 1 2 lightweight drywall such as certainteed easi lite is required.
Ceiling joists are normal perpendicular to drywall.
Install the second layer of drywall on both the ceilings and the walls with the sheets fitted at a 90 degree angle to the first layer.
Countersink the screw heads to be sure the drywall will lay as flat as possible over the strips.
I m often tempted to hang drywall parallel if that is the shorter dimension of the ceiling and in doing so would result in no butted seams on that ceiling.
Hold them up about 7 8 from the bottom of the joists and add a 4 1x4 centered on where the drywall will meet.
Typically 4 x 8 foot panels come bound in pairs two sheets face to face with paper strips binding the two sheets.
The first sheet of drywall was cut so that the seam is located between the framing.
Split the wall stud or joist down the center for cuts that run up the wall or across the ceiling.
There is absolutely nothing wrong with 17 19 on center which sounds like about 3 studs per sheet.
2 new drywall on wall meeting existing smooth surface drywall painted ceiling in a bedroom 4 walls.
Go across the room and drill and fasten the strips at each joist.
Tips for drywall sheets always choose thick sheets 1 2 or 5 8 if you re installing drywall on your ceiling.
The side that s gray or ivory should face the room.
When drywall ceiling panels are installed it is best to install them perpendicular to the ceiling joists instead of parallel to the ceiling joists also make sure that the butt joints are staggered so that continuous seams are avoided.
You cannot leave drywall simply overlapping a stud or joist so it must be cut to the center of a.
A good way to do this is to layout the panels in a subway tile pattern.
But the first floating technique uses less material and is what the pros do.
Use longer screws if you re dealing with thick plaster or the 2 inch doesn t engage the joist.
As with the first layer cover the ceiling first before the.
Also don t locate a new seam on the same joist as the existing seam.
It s important to know each side of the drywall sheet.
Thinner drywall sheets such as 1 4 or 3 8 will sag in between rafters over time.
Drive 2 inch drywall screws to fasten the strips to the joist.
This will give you your 1 8 recess too.